• Hospital
  • Independent hospital

25 Harley Street

Overall: Good read more about inspection ratings

25 Harley Street, London, W1G 9QW (020) 3883 9535

Provided and run by:
9 Harley Street Limited

Assessment report published 29 October 2026

On this page

Safe

Good

29 October 2026

We looked for evidence that safety was a priority for everyone, and leaders embedded a culture of openness and collaboration. Leaders had systems for identifying and responding to deteriorating patients in the department. People received treatment and care to reduce the risk of avoidable harm, which included following safety standards and safety checks prior to entering the scanning areas. There were safety processes arranged before procedures started, with staff working together to ensure the right patient had the correct imaging. Patients were safe from neglect, abuse and discrimination. Patient’s gave informed consent prior to procedures and where they were unable to consent, those close to them were involved in decisions made in their best interests.

At our last assessment we rated this key question requires improvement. At this assessment the rating has changed to good. Patients were safe and protected from avoidable harm.

We have not awarded this service a score for Safe.

Find out about when we will not publish a key question score and what we look at when we assess Safe.

Learning culture

Score: 3

The service had a proactive and positive culture of safety, based on openness and honesty. Staff and leaders listened to concerns about safety and investigated and reported safety events. Lessons were learnt to continually identify and embed good practice. Learning was shared with staff.

The service managed patient safety incidents well. Staff we spoke with told us they recognised and reported incidents and near misses in line with the local procedure. Managers investigated incidents and shared lessons learned with the whole team and the wider service. When things went wrong, staff apologised and gave patients honest information and suitable support.

The service had a current patient safety incident response policy, which outlined the provider’s approach to a patient safety incident and referenced national guidelines. The policy listed the updates that had been made, and it was clear to staff what had been updated. It had a review date and included an equality impact assessment which had been considered before the new policy was ratified.

We saw evidence of incidents having been investigated, and action taken to reduce the risk of recurrence. In the last 12 months, 3 incidents had been reported in the imaging department. The system for managing incidents was electronic. Staff knew how to raise a concern and were able to do so, this was reviewed by the director of clinical services (DCS). We reviewed the 3 reported incidents and found that they had been investigated, and learning identified and shared with staff in staff meetings and via newsletters. For example, one incident identified information on a referral letter was not sufficient under the Ionising Radiation (Medical Exposure) Regulations 2017 (IR(ME)R). Learning was shared with radiographers and administrators who were reminded to review referrals before imaging took place and to obtain a new request if it had not been completed to the standard required. All incidents were recorded in the incident log which detailed the incident and action taken as a result of learning identified.

The director of quality and risk met with the director of clinical services (DCS) weekly and review all open incidents and discussed what actions were in progress. The outcome of this meeting was reviewed at the monthly integrated governance meeting (IGM), where the timeline of an incident was reviewed. The meeting minutes and quality report for the IGM demonstrated that incidents and complaints were reviewed and heads of department were responsible for cascading learning to teams via department meetings. The quality report identified themes and reviewed the top 3 incident categories. The data was broken down to for managers to understand where in the department the incident occurred or complaint related to. The data showed between April to June 2026 (Q2) no patient harm or adverse diagnostic outcomes were identified. Leaders told us this meeting provided an opportunity for learning from across all the provider’s locations including from incidents at other locations.

There had been zero reported never events in the preceding year. Never Events are serious, largely preventable safety incidents which should not occur if the available preventative measures are followed. Staff we spoke with knew what never events were reportable.

Incidents were analysed to identify trends or themes and potential links to individual practitioners. There had not been any repeated themes or trends in the year prior to our assessment.

Staff we spoke with knew how to report risks and felt confident to do so. They told us they were supported by senior leaders and received individual feedback following investigations. Staff understood the duty of candour and told us they would speak with patients in an open and transparent way giving patients and families a full explanation if and when things went wrong.

The provider recorded 25 complaints across 2 outpatient locations in the last 12 months, 1 of which was a patient of the diagnostic services at this location. The complaint was not about clinical delivery and was investigated in line with the complaints process and resolved.

Safe systems, pathways and transitions

Score: 3

The service worked with patients and healthcare partners to establish and maintain safe systems of care, in which safety was managed or monitored. Staff made sure there was continuity of care, including when responsibility for patient care moved between different areas of a service and between providers.

Safety and continuity of care was a priority throughout the patient’s care pathway. Patients were assessed prior to diagnostic imaging, and all images were based on a formal request from a clinician in line with the ionising radiation (medical exposure) regulations (IR(ME)R) 2017. Patients were referred for imaging by clinicians working within the provider’s locations for example their outpatient centres and hospital and general practitioners. The service did not offer emergency scans, and all imaging was by pre-arranged appointment, including appointments made on the day.

There were procedures in place to identify and treat deteriorating patients. All staff received basic life support training and records demonstrated 100% compliance. Radiographers also received immediate life support training for adults and paediatrics. Compliance for both was over 90% which achieved the service’s target of 85% of staff trained. Radiographers and radiology healthcare assistants (HCAs) received training in National early warning score (NEWS2), at the time of our inspection data demonstrated 100% compliance with this training. NEWS2 is a nationally recognised tool used by clinicians to assess patients and determine if they are deteriorating.

The admission criterion for patients was detailed in the provider’s outpatient service criteria policy. This criteria set out which patients the service could not treat as they were unable to meet their individual needs. . For example, the service was an ambulatory service and did not see acutely unwell patients. The referring clinician assessed the patient them to make sure they were well enough for the service, as the service did not provide diagnostic imaging for emergency care.

There were systems and processes to ensure the correct patients were treated throughout the patient journey and they only received the scan which was intended. We observed staff speaking with patients before the scan confirming who they were and why they were there.

Patients we spoke with told us there was clear care pathway through the service and they knew what the next step in the care plan was. Some patients were able to have imaging taken on the day as the service held appointment space for on the day referrals.

Risk assessments were carried out for all patients when they attended the department. Patient questionnaires were completed prior to the procedure taking place, these included asking if a patient was pregnant. If a patients’ answer indicated they were unsuitable for a scan, staff would discuss this with the patient. In the notes we reviewed we saw that they all included a completed risk assessment and patient questionnaire.

Patient records were a mixture of electronic, and paper based and were kept securely. Referrals on the day were paper based and scanned on to the patients record at a later date.

Staff could access interpreting services for patients. This could be arranged in advance when the appointment was being booked or on the day to ensure patients could understand were communicated with in a way they understood.

Safeguarding

Score: 3

The service worked with patients and healthcare partners where required, to understand how best to keep people safe, what it meant for individuals and the best way to achieve that. Staff concentrated on protecting their right to live in safety, free from bullying, harassment, abuse, discrimination, avoidable harm and neglect. The service shared concerns quickly and appropriately.

Staff understood how to protect patients from abuse and the service worked well with other agencies to do so. Staff received adult and children's safeguarding training. The level was dependent on their role and outlined in the safeguarding policy. All staff received level 1 and 2 safeguarding adult and children. Data showed 87% of staff had completed their training which met the providers target of 85%. All registered clinical staff received level 3 adult and children safeguarding training. At the time of the inspection the compliance rate was 75% which was one member of staff. This staff member had the training booked a month after the inspection. To mitigate the risk associated with this, the staff rota ensured there was another level 3 trained clinician on every shift and the paediatric lead and director of clinical services who had completed level 4 safeguarding and was the safeguarding lead was onsite every day. The service had access within the large provider network to a level 5 trained safeguarding lead via telephone if needed.

We observed posters displaying the names of safeguarding leads across the service including their contact details. This ensured staff had access to the contact details of the safeguarding leads who they could call for advice and support.

There were in date safeguarding policies that reflected the national guidance for adults and children. Staff we spoke with knew how to make a safeguarding referral and who to inform if they had concerns.

In the last 12 months the service had not made any safeguarding referral. Leaders told us about the last referral they made which identified good practice identifying concerns and reporting.

All staff were required to complete a disclosure baring service (DBS) check prior to starting work at the service. At the time of our inspection data showed all radiology staff were 100% compliant. As per the providers policy, staff were required to renew their DBS check every 3 years. There were 4 members of staff who were currently being processed for a new DBS check before their existing one was out of date.

Involving people to manage risks

Score: 3

The service worked with patients to understand and manage risks by thinking holistically. Staff provided care to meet patient’s needs which was safe, supportive and enabled patient to do the things that mattered to them.

The service worked with patients to understand and manage risks. The treatment and care met patients' needs in a way which was safe and supportive. Staff told us they spoke with patients when trying to position them prior to the scan or Xray. This ensured the best possible image was taken and reduce the risk of an unclear image.

The service operated pause and stop which is a key patient safety measure in the imaging process. The standard operating procedure (SOP) listed the key areas of practice to reduce the risk of error. Staff we spoke with were aware of pause and stop and understood it was an important safety measure for every patient.

We spoke to 5 patients during our assessment who told us they felt listened to, risks had been explained, and they were involved in decisions about their care and treatment. The patient feedback we saw indicated that staff provided clear explanations regarding procedures and addressed questions and obtained consent appropriately. Patients reported feeling reassured and aware of risks associated with the diagnostic procedures they were having.

The service carried out comprehensive risk assessments to help protect staff and patients from ionising radiation exposure. The service contracted an annual report carried out by the radiation protection adviser (RPA). This included an action plan with mitigations in place such as ensuring that patients and staff maintained a safe distance from the source of radiation.

All radiographers and radiology HCAs completed radiation protection training. At the time of the inspection the service was 100% compliant, meaning all staff were appropriately trained to understand the risk associated with ionising radiation.

The service did not have an emergency department. If a patient deteriorated and needed higher level care, the service would call emergency services for an immediate transfer to a local NHS hospital. To provide emergency care while waiting for emergency services to arrive there were resuscitation grab bags which were easily accessible to staff in the event of an emergency and there were 2 resuscitation trolleys located in the clinical areas.

Safe environments

Score: 3

The service detected and controlled potential risks in the care environment. Leaders and staff took steps to make sure equipment, facilities and technology supported the delivery of safe care. Where they were unable to do so, they mitigated the risks.

The design, maintenance and use of facilities, premises and equipment kept people safe and staff were trained to use equipment. The service had 2 imaging suites for Xray and DEXA scans. We reviewed the maintenance agreements and found that the equipment was regularly reviewed. The Xray service report was submitted in February 2026 and found no concerns and the DEXA scanner was due to be inspected 3 weeks after our inspection. The service had an equipment replacement plan showing the year they expected to replace equipment.

The service had a contract in place with a radiation protection adviser (RPA) who offered support 24 hours a day 7 days a week. They assisted in the assessment of the environment and signed off areas as compliant with IR(ME)R. Screens were used to ensure staff safety when taking Xray’s.

Staff wore lead aprons to protect themselves from radiation. The aprons were audited annually, audits reviewed showed the equipment had been signed off as safe for use. Staff could refer to the standard operating procedure which advised staff to report any equipment failure to area managers. At the time of the assessment staff had not needed to raise any concerns.

Leaders maintained oversight of equipment to ensure it was safe and ready to use. Equipment audits were completed and outcomes shared with staff. For example, the lead apron audits were carried out quarterly identifying if any action needed to be taken and staff were made aware the aprons were safe to use. Staff told us they had enough equipment to carry out their work safely and to support the treatment and care needs of patients. There were effective processes for ensuring repair of or obtaining a replacement for broken or missing equipment.

Staff disposed of clinical waste safely, both inside and outside the building. Waste was segregated and labelled in accordance with the provider’s policy. Hazardous substances were stored safely and information about products was available to staff.

The environment used for patient care reduced the risk of patient harm, and included for example, safe flooring and handrails. Fire safety equipment was available, and we observed fire extinguishers throughout the building. Fire exits were clear and free from obstruction.

The Xray suite did not have a panic alarm for staff for staff to obtain assistance in the event of an emergency. Leaders told us that staff could dial the internal emergency number from the telephone on the desk. However, as the desk was small the telephone was on a shelf which might impede a call being made in an emergency in a timely manner. There was an emergency call cord which alerted the nurses station that support was needed which mitigated the risk.

Safe and effective staffing

Score: 3

The service made sure there were adequate numbers of qualified, skilled and experienced staff, who received effective support, supervision and development. Staff worked together well to provide safe care, which met patient’s individual needs.

The service had enough staff with the right qualifications, skills, training and experience to keep patients safe from avoidable harm and to provide the right care and treatment.

Staff included 5 whole time equivalent (WTE) radiographers and 2 WTE radiology healthcare assistants (HCA). The service had access to 10 bank radiographers who were used based on the demands of the service. These staff were deployed across all London locations for the provider depending upon their specialism. The service had 2 vacancies for additional radiology HCAs and were currently recruiting to these roles. During the assessment the actual staffing levels were as planned and we were told the service would book appointments according to their capacity. However, staff told us bank staff were used regularly and overtime was to fill rotas. This meant there was limited opportunities for clinical development including training in other specialist areas.

New staff and bank staff had a full induction tailored to their role before they started work. Managers supported staff to develop through annual appraisals and regular meetings to discuss their performance and objectives. Staff told us they found these useful and was a chance for them to discuss development opportunities and how they could manage this around the staffing rotas.

The service did not directly employ radiologists or other medical staff and had consultant radiologists working under practising privileges. There was a practising privileges policy in place which outlined how medical professionals could obtain practising privileges and the internal process to follow. This included confirming professional registrations and qualifications and that individuals only operated in a set scope of practice. The medical advisory committee (MAC) reviewed and signed off practising privilege applications meaning there was senior oversight of who was granted practising privileges.

Staff received mandatory training, data showed that the service met their target of 85% as over 85% of staff had completed their mandatory training in each module, except for level 3 safeguarding where mitigation was in place. Radiology specific training had been completed by 100% of staff the training was applicable to. Radiographers received refresher training on using the equipment, this included information about ionising radiation regulations and what this meant for staff safety. The competency assessment for the DEXA scan scored individual practice between 1 – 4. This was signed off by a trainer confirming staff were competent to use the equipment.

Infection prevention and control

Score: 3

The service assessed and managed the risk of infection. Staff detected and controlled the risk of it spreading by following policies. Infection, prevention and control data was collected and reviewed. Where required, actions were taken to improve shortcomings.

The service managed infection risks well. Staff used equipment and control measures to protect patients, themselves, and others from infection. They kept equipment and the premises visibly clean. The department was visibly clean, free from clutter and had suitable furnishings which were clean and well-maintained. We observed staff clean equipment after patient contact in line with the provider’s IPC policy.

There was a provider infection, prevention and control (IPC) policy and supporting guidance that was accessible to staff. This included information about audits that took place and the uniform dress code.

There was a programme of infection and prevention and control audits including for example, the hand hygiene, personal protective equipment (PPE) and clinical waste audits. We reviewed the last 3 audits and found there was 100% compliance.

The service performed well in housekeeping audits. We reviewed the audits from February 2026 and found that the service was 100% compliant. The audit included an action plan to list any actions required, the action owner and updates until the action was closed. At the time of the inspection there were no open actions.

Staff adhered to the provider’s uniform policy. We observed nail varnish and jewellery was not worn, and staff in clinical areas were bare below their elbows to allow for effective hand washing.

Medicines optimisation

Score: 2

We did not look at Medicines optimisation during this assessment. The score for this quality statement is based on the previous rating for Safe.