• Residential substance misuse service

The Haynes Clinic Limited Also known as Chicksands

Overall: Good read more about inspection ratings

6-7 Warren Court, Chicksands, Shefford, Bedfordshire, SG17 5QB (01462) 851414

Provided and run by:
The Haynes Clinic Limited

Assessment report published 30 October 2025

On this page

Safe

Inadequate

30 October 2025

We rated Safe as Inadequate because the service did not have a proactive and positive culture of safety. Safety incidents and complaints about the service were not fully investigated and lessons learnt were not always effectively actioned.

Admissions processes and risk assessments were not sufficient to determine if the person’s needs could safely be met.

The environment was not safe and mitigations to reduce potential ligature risks were not effective.

Systems and processes were not in place to ensure the safe prescription, storage, and administration of medicines.

Whilst staff were kept up to date with mandatory training, the training was mostly limited to e-learning.

However, people told us they felt safe. They were given the opportunity to raise concerns and knew how to do so. The service had low sickness and staff turnover rates.

We have not awarded this service a score for Safe.

Find out about when we will not publish a key question score and what we look at when we assess Safe.

Learning culture

Score: 1

The service did not have a proactive and positive culture of safety. Safety incidents were not investigated and reported thoroughly, and lessons to continually identify and embed good practices were not always learnt.

Whilst the service had a duty of candour policy in place staff were not given mandatory duty of candour training. Duty of candour mandates health and social care providers to be open and honest with people about their care and promotes a culture of learning. However, since our inspection the provider has told us they have made arrangements for this training to be provided to staff.

We asked the service to provide information on incidents that had occurred between May 2025 to July 2025. We reviewed a list that included 4 incidents during this time frame, (an unexpected death, 2 early exits from treatments and 1 incident relating to a physical health concern). There were no formal mechanisms in place at the service to routinely track, monitor or categorise incidents.

There was limited evidence that changes had been made because of learning from incidents, including action that had been taken following an unexpected death. Managers had taken action to learn lessons following the unexpected death including the introduction of an observation policy and items of furniture to be replaced, but we were not assured that the action taken would fully mitigate the risks of similar incidents occurring. There were no lessons learnt recorded for the other 3 incidents.

Staff told us they received feedback about incidents during handovers, morning and evening and staff team meetings. Staff were debriefed and received support after incidents. They met as a team for groups supervision following a serious incident. Some staff we spoke with told us they discussed what could have been done differently and described changes to practice that had been made as a result. Staff were offered 1:1 time and counselling.

We reviewed staff team meeting minutes and found incidents were shared with staff. However, there was limited evidence that lessons had been identified, or changes made because of learning from incidents shared.

There was no electronic incident reporting system in place. However, staff we spoke with knew what incidents to raise and said they would do so directly with managers.

People’s feedback about the service was that they felt safe and cared for.

Safe systems, pathways and transitions

Score: 1

The service did not always work with other agencies and professionals to establish and maintain safe systems of care, to manage, monitor and assure the safety of people.

Systems and procedures were not always safe when people were admitted to the service. Staff told us that initial assessments took place by telephone at the point of self-referral, if suitable for treatment, then a face-to-face appointment would be arranged. Final sign-off would be with the doctor which was sometimes done virtually. The service’s referral and admission processes did not ensure that all essential information about the person was received to determine if their needs could safely be met. The service relied on information provided by the person, or a family member on admission. General Practitioner (GP) summaries were not requested as standard before or on admission. Managers told us they contacted a GP for information only if there was a query about prescribed medicines. No blood tests or liver function tests were conducted prior to starting detox. This meant medical summaries and blood test results were not recorded in people’s records. Therefore, information concerning a person’s health was not always known on admission, meaning that clinical decisions were not always safe. Staff told us that people would be taken to hospital if blood results were needed.

Whilst the service had an admissions policy in place we reviewed a separate document which set out guidance on the acceptance (exclusion) criteria for staff to assess someone’s suitability for the type of treatment and residential accommodation offered. This document was brief and did not include a clear process for staff to follow.”

The service had a discharge policy in place and an admission checklist to refer to when admitting new people. The discharge policy stated processes for planned discharge and unplanned discharge and follow up and aftercare. The policy was dated July 2025. Staff told us they would notify next of kin of unplanned discharges and the police if they were concerned the person could be in danger. However, people’s notes did not always include a discharge plan and not all people we spoke with knew if they had a discharge plan in place. Discharge planning did not routinely include information sharing with the person’s GP to manage risk after discharge from treatment.

Managers told us that checks were made on contacts with departed patients at 1 week, 1 month, 3 months, 6 months and a year after discharge. The service discharge policy stated the service would provide signposting to local recovery networks, counselling, and GP support. The service did not liaise with people’s mental health teams when they were admitted or at any time during their stay including on discharge.

There was no formal arrangements in place with the local pharmacy such as a service level agreement or contract to visit the clinic to support with medications or to complete medicines audits.

Safeguarding

Score: 2

Staff received Safeguarding and Protection of Adults mandatory training. Managers told us that Safeguarding training was provided by an external training provider. 12 members of staff were expected to be trained on safeguarding. All but 1 of these members of staff were up to date.

Staff were kept up to date with mandatory training on the Mental Capacity Act and Deprivation of liberty standards (DOLS), 100% of staff had received this training. However, the service did not provide mandatory training on safeguarding children or Learning Disability and Autism. Following our inspection the provider has told us they have made arrangements for this training to be given to staff, although no dates were provided.

Managers told us they had not needed to make any safeguarding referrals in the 3 months prior to the inspection. They said that they had made referrals in the past but had not needed to do so often. This meant they did not have regular contact with local authority safeguarding teams.

Staff told us they would escalate any safeguarding concerns to management. The clinic manager was the safeguarding lead. Staff said they could access safeguarding policies in the office.

We reviewed monthly staff team meeting minutes for May, June and July 2025 and found 2 examples of safeguarding concerns, that had involved the police were shared with staff. However, these concerns were not reported to the local safeguarding team.

People told us they felt safe and well looked after at the service. We reviewed a feedback report from 2024 and saw that people reported they felt the environment was safe.

Involving people to manage risks

Score: 1

During the inspection we reviewed 9 risk assessments and found these were not robust. The risk assessment form was basic with no opportunity for personalisation or written updates should there be changes. They contained little detail, no context was given to risks, no description of factors that would exacerbate risks and no risk mitigation or reduction plans were included. People’s risk assessments were not updated and there was no space on the form to do so. This meant that risks documented were not always current. People had not been involved in the formulation of risk assessments and care planning. They lacked evidence of comprehensive physical health and mental health assessment.

The service collected limited information about people prior to and on admission. Risk assessments lacked essential information including details of drugs or alcohol used, patterns of use and when substances were last used. The service did not request General Practice (GP) summaries prior to admission and did not complete blood tests including liver function tests prior to starting detoxification. Staff we spoke with confirmed that these were not requested before admission. Essential information about people was missing, meaning these risks were not, assessed, recorded or mitigated. This was in contradiction to guidance in the UK guidelines on clinical management of drug misuse and dependence.

We saw an assessment form for 1 person which mentioned blackouts and frequent falls which are risk factors for Wernicke’s encephalopathy (a neurological disorder), yet the provider took no further monitoring or follow up.

Following a serious incident at the service, managers introduced a policy and procedure for the observation of people. We reviewed observation records for 4 days at both Everton Park and Rowney House and saw that people’s locations were marked every hour on the hour but that there was no additional information such as people’s mood, activity or presentation. This meant people were at potential risk of being able to harm themselves in the time between observations due to staff predictability. Therefore, the policy was not fit for purpose.

Staff gave people the opportunity to give feedback or raise concerns at weekly community meetings and were provided with a feedback form towards the end of their stay. We reviewed feedback summaries of 25 people in 2024, the results included positives about their experience as well as areas for improvement. All 25 respondents said they felt safe.

Staff met in the morning and evening for handover meetings. We observed a handover meeting and reviewed handover meeting notes, we saw that each person was discussed, and daily notes were read out.

Safe environments

Score: 1

The environment was not always safe. We did a tour of the environment and found there were multiple ligature anchor points. A ligature anchor point is any fixed or load-bearing point that can be used to attach a cord or other material to create a means of strangulation or hanging. We reviewed the service’s ligature risk assessments and found these were not robust and lacked essential information to mitigate and minimise the risk to people. Following our inspection the provider has told us they will be reviewing and updating all ligature risk assessments.

Following an unexpected death at the service, managers had identified and listed potential ligature risks. However, they had not put in place adequate mitigations to prevent future incidents. A general building risk assessment dated May to July 2025 included ligature risks and described the mitigation as preventing the admission of anyone vulnerable to suicide risk and, monitor by psychiatrist and staff and supervision of occupants. Mitigations for people admitted to the service only depended on staff observations. These were not recorded effectively and the admission protocol for people at risk of suicidal ideation was unclear and therefore at risk of not being applied consistently by staff.

People’s bedrooms did not contain call bells or any means of raising an alarm to staff if unable to call out loudly. This meant that staff could miss opportunities to assist people in a medical emergency. Following the inspection the service installed call bells in bedrooms.

Fire risk assessments were requested as part of the inspection process and the 2022 assessment was provided by the service. Since our inspection, the provider have sent us additional fire risk assessment. However, there are outstanding actions required from the 2024 assessment of Exeter Wood.

The residential houses complied with guidance on mixed-sex accommodation and were segregated by male and female areas.

We observed most areas to be clean, tidy and well furnished. However, there were some areas that required maintenance. For example, Cotton End house bathroom and stairs.

The service had a business continuity policy which covered the following aspects: Utilities Failure; Adverse Weather/Winter Planning, Pandemic Management, Force Majeure Situations, Physical Damage and Safety Device Malfunction. The policy was created in 2019 and had been updated in May 2025.

Safe and effective staffing

Score: 2

The service had no staff vacancies and people told us that staff were always visible. In the 3 months before the onsite inspection the service had low sickness rate (4%) and staff turnover rate (0%). Whilst the service was fully staffed with 3 therapists, 5 support workers and a doctor (psychiatrist) the service did not have a registered nurse in post.

Managers did not ensure staff received adequate training. We reviewed the service’s mandatory training courses and whilst 100% of staff had completed these courses the training was limited; it consisted of e-learning modules only. Managers told us some staff had completed a first aid course and a safeguarding course with an external provider who came to the clinic.

Induction training for new staff also only consisted of mandatory e-learning and reading through policies.

Infection prevention and control

Score: 3

We observed areas to be clean and tidy. The service employed a cleaner, and people took responsibility for cleaning the houses themselves, they had a rota for doing so.

We reviewed staff team meeting minutes for the past 3 months and saw that housekeeping issues were discussed. There had been no complaints relating to cleanliness.

There were no infection, prevention and control audits. However, staff received and were kept up to date with mandatory infection control training and food hygiene training was made available to roles that required it.

Medicines optimisation

Score: 1

Systems and processes were not in place to ensure the safe prescription, storage, and administration of medicines and the service did not have any clinical oversight of medicines management and detoxification.

Staff administering medicines were not adequately trained. Medicines administration training was delivered by e-learning only with no competency checks completed by a relevant person. This meant people were at risk of being given the wrong medication or the wrong amount of medication.

The pharmacy did not visit to audit or check stock, and the Provider did not undertake audits of medicines administration records. A lack of robust medicines audit meant we found errors on medicines administration records including no prescriber details recorded, no signature of the staff member administering medicines, and no start and stop date recorded. In 1 chart we found an error in the recording of an amount of medicine administered.

There were no special instructions included in the records for what staff should do in the case of adverse reaction. For example, there were no alerts within the records to staff for people prescribed chlordiazepoxide (used for the detoxification from alcohol misuse) and zopiclone (used for sleeping problems) of risk of respiratory depression, and what action to take if people appear drowsy.

Prescribing was not consistent with outcome scales. We reviewed 9 care records and saw that 1 person had commenced detoxification despite scoring 13 on the Severity of Alcohol Dependency Scale which is a lower level than indicates detoxification. Another person scored 17 on the Severity of Alcohol Dependency Scale which would indicate detoxification was appropriate, but they were not provided with detoxification. This put people at serious risk of alcohol withdrawal harm including seizures.

Staff did not complete withdrawal scales during detoxification to ensure prescribing levels were safe. Six people did not have a Clinical Institute Withdrawal Assessment for Alcohol (CIWA) completed during their detoxification. This meant people were at risk of being over-prescribed medicines that could lead to respiratory depression or under prescribed which could result in withdrawal tremors or more serious side effects.

Medicines were not stored appropriately. There were no medicines fridges in houses and medicines were not stored in fridge at the clinic. Staff told us if a people required insulin they could keep it in the food fridge. A medicines cupboard kept in the staff room was locked however the keys were kept in an unlocked wardrobe and the staff room remained unlocked when not in use. This meant people could gain easy access to medications without supervision.

The service did not stock any emergency medications, such as adrenaline. In the event of anaphylaxis staff would need to call an ambulance.

There was no record of stock medicines kept in ‘house boxes’ of medicines.

Managers told us that naloxone was available at the service in the houses and in the clinic. No naloxone was given on discharge, managers told us staff were trained in its use, but people were not. Naloxone is a medicine that is used to reverse or reduce the effects of opioid use.