- Independent hospital
The Montefiore Hospital
Assessment report published 30 September 2026
Contents
On this page
- Overview
- Learning culture
- Safe systems, pathways and transitions
- Safeguarding
- Involving people to manage risks
- Safe environments
- Safe and effective staffing
- Infection prevention and control
- Medicines optimisation
Safe
We looked for evidence that safety was a priority for everyone, and leaders embedded a culture of openness and collaboration.
At our last assessment we rated this key question good. At this assessment the rating has remained good. This meant people were safe and protected from avoidable harm.
The medical care service had a good learning culture and information regarding investigations was shared with all staff. Managers investigated incidents thoroughly. People were protected and kept safe. The facilities and equipment met the needs of people, were clean, well-maintained and any risks mitigated. There were enough staff with the right skills, qualifications and experience. Managers made sure staff received training and regular appraisals to maintain high-quality care. Staff managed medicines well and involved people in planning any changes.
We have not awarded this service a score for Safe. Find out about when we will not publish a key question score and what we look at when we assess Safe.
Learning culture
The service had a proactive and positive culture of safety, based on openness and honesty. Staff and leaders listened to concerns about safety and investigated and reported safety events. Lessons were learnt to continually identify and embed good practice. Learning was shared with staff.
The medical care service promoted a positive safety culture based on openness and honesty. Staff took concerns about safety seriously, reported incidents and near misses, and used learning to improve practice. The hospital held quarterly medical advisory committee (MAC) meetings where incidents and opportunities for learning were discussed.
The medical care service had an up-to-date incident reporting and review policy that reflected national guidance. Staff told us they received feedback about incidents in a variety of ways, including ‘Feedback Friday’ updates, meetings, daily huddles, emails and one-to-one discussions.
Staff understood their responsibilities under the duty of candour, which requires openness and transparency with patients when something goes wrong. The service had a duty of candour policy, and staff followed this as required.
We saw clinical departments held daily safety huddles, giving colleagues the opportunity to raise issues and discuss safety concerns. We saw staff were supported following incidents.
We spoke with patients and their relatives during the assessment, and they told us they knew how to raise a complaint or concern. Patients said they would feel comfortable raising an issue with the staff caring for them and knew how to make a formal complaint, should they need to.
The endoscopy service was accredited by the Joint Advisory Group on Gastrointestinal Endoscopy (JAG) in 2023. JAG accreditation is a nationally recognised quality standard which assesses endoscopy services against defined criteria for clinical quality, safety, workforce competence, patient experience, and governance. Accreditation requires services to demonstrate compliance with evidence‑based standards, including effective leadership, audit, training, and continuous quality improvement.
Staff used the 5 steps to safer surgery in endoscopy procedures. There were no serious incidents reported in the last 12 months in medical care. The endoscopy service recorded learning from adverse events and near misses as part of their annual JAG accreditation.
The oncology service followed nationally recognised guidance, “the Guidelines for the management of extravasation of systemic anti‑cancer therapy (SACT)”, to support the safe administration of treatment. Staff told us the service was also trialling the use of technology designed to reduce the incidence of extravasation injury.
In SACT, extravasation injury occurs when anti‑cancer drugs leak from the vein into surrounding tissue during intravenous administration. As many SACT drugs are highly toxic to tissue, extravasation is considered a serious patient safety incident within oncology services. The use of recognised guidance alongside the evaluation of new technology demonstrated a proactive and evidence‑based approach to reducing risk and improving patient safety.
Safe systems, pathways and transitions
The service worked with people and healthcare partners to establish and maintain safe systems of care, in which safety was managed or monitored. Staff made sure there was continuity of care, including when responsibility for patient care moved between different areas of the service and between providers.
The medical care service’s referral and admission processes ensured that all essential patient information was obtained to assess whether patients’ needs could be safely met. We reviewed patient records and saw completed referral documentation, pre‑assessment information, and discharge summaries.
All referrals were reviewed through multidisciplinary team discussions to confirm that the service had the appropriate skills, facilities, and resources to meet individual patient needs; and to agree the treatment plan.
The Sussex Bowel Cancer Screening Programme (SBCSP) completed pre‑procedure assessments and shared this information with the service. Staff reviewed this information thoroughly and followed up any concerns to maintain continuity of care.
All private oncology patients were discussed at the NHS multidisciplinary team meeting. The cancer care nurses had access to the MDT records, and no treatment was carried out without oversight of the MDT records. Discharge summaries and treatment plans were shared with NHS services when unwell patients receiving chemotherapy attended NHS Emergency Department (ED). We saw an example of the triaging nurse calling ahead so a patient with a temperature was expected and their clinical condition was understood.
NHS services liaised with the service in the event of an admission following a procedure. Patient records were a mixture of electronic, and paper based and were kept securely. The IT connectivity was consistently available across the service to meet the needs of staff completing the records.
When overall responsibility for the care and treatment of a patient moved to a different service provider, such as transfer to the NHS, there was effective communication, which allowed for seamless transfer.
Safeguarding
The evidence showed the service maintained a good standard of safeguarding. The service worked proactively with people and healthcare partners to define what safety meant to them and to determine the best ways to achieve it. We saw an example of this when the service was caring for a patient with learning difficulties. Staff focused on improving people’s lives while upholding their right to live safely, free from bullying, harassment, abuse, discrimination, avoidable harm, and neglect. The service also shared any safeguarding concerns quickly and appropriately.
The hospital director held responsibility for safeguarding, and the deputy director of clinical services (deputy DoCS) were the hospital’s safeguarding lead, they were trained to level 4. Staff described the deputy DoCS as highly supportive and readily available for safeguarding advice.
The hospital maintained an up‑to‑date safeguarding policy and pathway aligned with national guidance. Staff could access this easily via the intranet, and safeguarding posters were displayed in pre‑operative assessment, theatres, and ward areas. Staff understood how to access safeguarding procedures and how to escalate concerns.
Staff demonstrated understanding of how to protect patients from abuse and worked effectively with partner agencies.
Staff demonstrated understanding of the Mental Capacity Act 2005 (MCA) and Deprivation of Liberty Safeguards (DoLS) and had completed relevant training.
Staff followed safe procedures for family and friends visiting the ward.
Involving people to manage risks
The evidence showed a good standard. The service worked with people to understand and manage risks by thinking holistically. Staff provided care to meet people’s needs that was safe, supportive and enabled people to do the things that mattered to them.
Staff followed policies and processes to complete individual risk assessments for patients who attended for endoscopy and oncology procedures. Patient assessments were carried out to manage risks in line with national guidance. Risk assessments were undertaken in areas such as venous thromboembolism (VTE), falls, malnutrition and pressure sores. These were assessed and documented in the patient’s records in line with best practice. Audit data provided showed VTE assessment was 98% and clinical risk assessment audit 100%.
Staff communicated with patients so that they understood their care and treatment, including finding effective ways to communicate with patients with additional needs. Staff enabled patients to give feedback on the service they received for example, via surveys and community meetings.
All patients attended a pre-assessment clinic prior to their endoscopy appointment. This was run by registered nurses who checked past medical history and general safety information to determine if the patient was fit for the procedure. On the day of the endoscopy procedure, nurses checked what patients had been asked during pre-assessment to ensure their condition had not changed. The service had a vulnerable patient pathway, and staff knew in advance when patients with additional needs were attending and planned to meet these needs and reduce risks posed to them.
The oncology service used a digital chemotherapy prescribing system to complete complex dosing calculations, tailored protocols and the handling of high-risk medications to ensure management of chemotherapy treatment cycles was safer and more efficient. Patients attending for chemotherapy received holistic assessments prior to each course of treatment to ensure they were clinically fit to proceed and that any changes in their condition were identified and addressed promptly.
The endoscopy service used the 5 steps to safer surgery, which included the World Health Organisation (WHO) surgical safety checklist. The WHO checklist is a nationally recognised system of checks designed to prevent avoidable harm and mistakes during surgical procedures. These checks consisted of team briefing, sign in (before anaesthesia), time out (before surgery starts), sign out (at the end of the procedure) and debrief. WHO checklists and Local Safety Standards for Invasive Procedures were used within the endoscopy department, and audit data showed 100% compliance for the service.
Safe environments
The evidence showed a good standard. The service detected and controlled potential risks in the care environment. Leaders and staff made sure equipment, facilities and technology supported the delivery of safe care. Where they were unable to do so, they mitigated the risks.
The design, maintenance and use of facilities, premises and equipment kept people safe. Staff were trained to use equipment and to manage different types of waste safely. The design of the environment followed national guidance around the built environment. Where required, areas were secure and protected patients.
Fire safety equipment was available and had been serviced. Fire exits were clear and free from obstruction.
The oncology suite had 6 treatment pods with reclinable chairs used for patients who attended for chemotherapy. The unit has the Macmillan Quality Environment Mark (MQEM) which champions cancer environments that go above and beyond to create welcoming and friendly spaces for patients. The MQEM recognises welcoming and accessible environments that support comfort, privacy and dignity and gives choice and control to the user.
All sharps and cytotoxic (a substance that kills cells, including cancer cells) clinical bins were managed in line with HTM 07/01: The safe management/disposal of healthcare waste 2013. There were appropriate segregation and disposal processes in place. We were shown a waste bag film sealing device for safe disposal of cytotoxic waste which was fully compliant with HTM 07/01. The bags were compacted, removed from the device weekly and taken to the holding waste outside the compound for safe disposal. We saw a quick reference guide for dealing with cytotoxic spillage on the wall in the treatment room. This provided assurance that cytotoxic waste was being securely sealed and disposed of safely, reducing the risk of exposure to staff, patients, and the environment.
Under JAG accreditation the endoscopy environment and equipment were subject to regular audits. Monthly medical devices audit showed 96% compliance. Quarterly endoscopy environment audit showed 100% compliance. Endoscopes Annual Health Check was last undertaken in June 2025, with no issues in performance identified but noted that gastroscopes would become obsolete in 2026. The provider has taken steps to replace these.
Resuscitation trolleys were secured using anti tamper tags to provide assurance that equipment had not been accessed inappropriately. Staff completed daily checks of the resuscitation equipment located on top of the trolleys, with full monthly checks of trolley contents. These checks were documented consistently.
Safe and effective staffing
The evidence showed a good standard. The service made sure there were enough qualified, skilled and experienced staff, who received effective support, supervision and development. Staff worked together well to provide safe care that met patients’ individual needs.
The service used a safe staffing tool to calculate staffing requirements. Daily safety huddles included reviews of staffing levels, sickness, and the use of supernumerary staff.
Managers told us they had flexibility to deviate from the Spire Healthcare Limited acuity tool where required to reflect the specific needs of the ward. Staffing levels could be increased or reduced based on real‑time clinical need. For example, where patients returned late to the ward following procedures and had higher acuity needs, an additional nurse could be allocated to ensure patient safety. The oncology service had developed their own staffing tool that aggregated complexity of treatment with the amount of registered nursing time to administer and monitor patients receiving chemotherapy.
The hospital operated an 80/20 ratio with 80% of staffing permanent and 20% temporary to allow managers to flex staffing in line with hospital activity. Agency and bank nursing staff were deployed as required to maintain safe staffing levels. We saw evidence that agency and bank nursing staff received an induction and were familiar with the area.
There was adequate 24-hour medical cover provided by 5 Responsible Medical Officers (RMO). RMOs were employed jointly with the local NHS trust and undertook a twelve-month placement whilst completing Post Graduate teaching certificate.
Consultants were not directly employed but had practising privileges at the hospital and would make arrangements individually to review their patients when they were on the ward. These practising privileges (PPs) were outlined in the practicing privileges and appraisal policy. This policy and other related policies documented eligibility for privileges, roles and responsibilities, scope of practice and how their work was reviewed. The Medical Advisory Committee (MAC) authorised the formal granting of practicing privileges, and this was documented in staff files. The MAC committee also reviewed PPs in terms of scope of practice and competence.
All new staff completed a 12-week induction programme and recorded progress in individual skills and learning passport and a personal learning checklist. All staff had an appraisal known as “Enabling Excellence Review” which set individual objectives and monitored progress throughout the year.
Staff in oncology and endoscopy had received and were up to date with appropriate mandatory training. The training was appropriate for the patient group using the service. The provider used a nationally recognised training to meet its mandatory training requirements on learning disabilities and autism.
Clinical supervision followed policy and guidelines for registered nurses and healthcare professionals and healthcare assistants alongside competency frameworks for registered and unregistered staff. Managers supported staff to develop through yearly, constructive appraisals of their work. Data showed 100% of endoscopy and oncology staff had an appraisal within the last 12 months.
The hospital had a defined recruitment pathway and procedures to ensure that the relevant recruitment checks had been completed for all staff. These included a disclosure and barring service (DBS) check, occupational health clearance, references and qualification and professional registration checks.
Infection prevention and control
The evidence showed a good standard. The service assessed and managed the risk of infection. Staff detected and controlled the risk of it spreading by following policies. Infection and prevention and control data was collected and reviewed. Where required, actions were taken to improve shortcomings.
Staff maintained equipment well and kept it clean. The service had moved to an electronic recording system of cleaned equipment however some previous, out of date “clean” stickers remained visible on equipment.
All ward areas were clean, had required furnishings and were well-maintained. Cleaning records were up to date and demonstrated that the ward areas were cleaned regularly. Staff adhered to infection control principles, were bare below the elbow and complied with clinical guidelines.
Decontamination processes and competencies for endoscopy have been set out in the Institute of Decontamination Science’s educational framework and the British Society of Gastroenterology. There were defined roles and responsibilities detailed in the endoscopy decontamination policy and we saw evidence that decontamination procedures were followed and recorded appropriately. Institute of Healthcare Engineering and Estate Management (IHEEM) annual decontamination audit was completed with no reported issues.
Infection Prevention and Control (IPC) audits completed between 01/02/2025 and 31/01/2026 included all areas of the endoscopy environment. The Annual Endoscopy Environment (IPC), the quarterly hand hygiene audit and annual PC efficacy audits achieved 100%. Weekly National Standards for Healthcare Cleanliness 100%.
Medicines optimisation
The service made sure that medicines and treatments were safe and met people’s needs, capacities and preferences. Staff involved people in planning, including when changes happen.
Staff followed good practice in medicines management in line with national guidance. In oncology cytotoxic medicines were stored securely with clear segregation from non‑cytotoxic medicines. Spill kits for cytotoxic medicines were available and in date. There was a specialist oncology pharmacist and oncology trained pharmacy technician to cover in the absence of the pharmacist.
The oncology service used a digital chemotherapy prescribing system to complete complex dosing calculations, tailored protocols and the handling of high-risk medications to ensure management of chemotherapy treatment cycles was safer and more efficient. Chemotherapy regimens were checked according to agreed protocols before undertaking clinical screening (bloods and test results) a week before planned treatment. We observed 2-person checks completed before chemotherapy infusions were started.
Medicines fridges were monitored and temperature logs completed. A clear sign in and sign out process was in place for endoscopy staff to collect controlled drugs (CDs) keys from the ward. Medicines such as sedation and opioids for pain relief, used for endoscopy procedures, were checked thoroughly against the CDs book.