• Care Home
  • Care home

Copper Beech Care Home

Overall: Requires improvement read more about inspection ratings

Eastbourne Road, Ridgewood, Uckfield, East Sussex, TN22 5ST (01825) 769947

Provided and run by:
Bupa Care Homes (ANS) Limited

Assessment report published 26 November 2026

On this page

Safe

Requires improvement

10 November 2026

Safe – this means we looked for evidence that people were protected from abuse and avoidable harm.

At our last assessment we rated this key question good. At this assessment the rating has changed to requires improvement.

This meant some aspects of the service were not always safe.

This service scored 59 (out of 100) for this area. Find out what we look at when we assess this area and How we calculate these scores.

Learning culture

Score: 2

The registered manager did not always ensure a proactive and positive culture of safety based on openness and honesty. On the day of the planned power outage, gaps in emergency planning had not been acknowledged, and measures to manage the incident had not been put in place. This disrupted people’s daily routines and limited their ability to move safely around the home. This increased risks for people who relied on electric profiling beds for safe positioning and support during meals. Following these concerns being raised with the provider and area management team, action was taken to address them and apply lessons learnt from the incident. Once the concerns were raised directly, the provider responded immediately and took decisive action to strengthen procedures, address the identified failures and ensure learning from the incident was embedded into practice to reduce the risk of recurrence.

Staff told us they shared learning experiences. Staff also told us how they worked with student nurses and found this beneficial for their learning and had received positive feedback from the students.

Relatives told us staff listened to them if they had any concerns.

Safe systems, pathways and transitions

Score: 3

The provider worked with people and healthcare partners to establish and maintain safe systems of care, in which safety was managed or monitored. They made sure there was continuity of care, including when people moved between different services. People had smooth transitions into the service. Pre assessments were carried out by the management team and involved people and their relatives.

One person told us they found the transition very smooth, they asked lots of questions and felt like they knew the home before moving in. One relative told us, "At the very beginning I went and met the manager beforehand. They talked about [relative] and their needs.”

Safeguarding

Score: 2

The registered manger did not always work well with people and healthcare partners to understand what being safe meant to them and how to achieve that. They did not always concentrate on improving people’s lives or protecting their right to live in safety, free from bullying, harassment, abuse, discrimination, avoidable harm and neglect.

The registered manager had not made adequate arrangements to protect people from potential harm during the planned power outage. There were no effective measures to ensure people received the support they needed to move safely and freely around the home. For example, staffing levels had been suitably assessed and bedroom and corridor doors remained closed. The outage disrupted people’s daily routines, and they had not been given sufficient advance notice to help minimise any distress.

The Mental Capacity Act 2005 (MCA) provides a legal framework for making particular decisions on behalf of people who may lack the mental capacity to do so for themselves. The MCA requires that, as far as possible, people make their own decisions and are helped to do so when needed. When they lack mental capacity to take particular decisions, any made on their behalf must be in their best interests and as least restrictive as possible. People can only be deprived of their liberty to receive care and treatment when this is in their best interests and legally authorised under the MCA. In care homes, and some hospitals, this is usually through MCA application procedures called the Deprivation of Liberty Safeguards (DoLS). DoLS had been applied for, where required, and was monitored to ensure they remained relevant for individuals.

However, the service worked with the local authority and raised concerns when required. Staff had specific safeguarding training and knew how to protect people from harm.

A relative told us they felt their loved one was “one hundred percent safe."

One person told us, "When I fell in the shower, staff never left my side until the ambulance came, they have always looked after me."

Involving people to manage risks

Score: 2

The registered manager did not always work well with people to understand and manage risks. There was not always sufficient staff on shift due to allocations to meet peoples needs in the event of a planned significant event.

The registered manager had failed to put adequate provisions in place to reduce potential risks for people during the planned power outage. Electric profiling beds were not fully operational. This placed people who remained in bed at increased risk because staff could not reposition them safely or support them appropriately when they were having their meals.

However, people had risk assessments in place for identified risks. For example, if people were at risk of falls they had specific risk assessments in place with guidance for staff how to keep them safe. Staff knew how to keep people safe and supported people to take positive risks.

One relative told us, "There is always someone keeping an eye on the people in the lounge."

Safe environments

Score: 2

The provider did not always detect and control potential risks in the care environment. They did not always make sure equipment, facilities and technology supported the delivery of safe care.

Environmental risks associated with a prolonged power outage had not been adequately planned for. Corridor and bedroom fire doors remained closed, preventing people from moving independently around the service. Food and medicine fridges were kept closed to help retain their internal temperatures during the several hours without power. Some areas of the home were in darkness because emergency lighting did not cover all areas and only a limited number of torches were available. For example, toilets had no lighting.

However, the home was well laid out, and we saw people enjoying the communal areas. Equipment was maintained and regular fire drills took place.

One relative told us, "It is safe and homely, [relative] has her own room and personal things in her room."

One relative told us, "They have all fire doors and drills. Everything seems to be as I should be.”

Safe and effective staffing

Score: 2

The registered manager did not always make sure there were enough qualified, skilled and experienced staff. They did not always work together well to provide safe care that met people’s individual needs. Staffing levels would normally have been increased during a planned power outage to support regular checks on people, as stated in the provider’s policy for planned power outages. Two domestic staff members had been deployed across the two floors to increase the frequency of checks, once staff were aware that this was a planned power outage. Despite this, call bells were not working effectively, and some people remained in their bedrooms for prolonged periods with their doors closed.

However, safe recruitment processes were in place and staff received training relevant to their roles, although some training remained outstanding, which we discussed with the registered manager.

We received mixed feedback around staffing levels. One member of staff told us, "Yes I make sure I maintain all of my training and competencies, especially things like meds as I like to be able to help out if for example, they are short staffed."

One member of staff told us, "I feel like there should be more staff available in the mornings upstairs. Sometimes I have to stop what I am doing and go and help them because it is too much."

A relative told us, "I do get the impression the staff are always busy. Probably there is enough staff, everybody seems to be up and dressed."

Infection prevention and control

Score: 3

The provider assessed and managed the risk of infection. They detected and controlled the risk of it spreading and shared concerns with appropriate agencies promptly. Staff were seen to be using personal protective equipment (PPE). Regular cleaning was taking place. There was a cleaning schedule in place. There were regular infection prevention and control (IPC) audits carried out. We raised an issue with a storage cupboard containing unclean items, this was acted upon promptly and the cupboard was cleared and deep cleaned when we returned to continue our inspection the following week.

Medicines optimisation

Score: 3

The provider made sure that medicines and treatments were safe and met people’s needs, capacities and preferences. Staff involved people in planning, including when changes happened. We observed a medicine round, and staff were knowledgeable about the medication they were administering, asked people for consent and explained to each person what their medicine was for. Staff supporting with medicines had received appropriate training. Regular medicine audits took place.